top of page

Scaling Production Capacity with Lean Assembly Line Design

Sponsor

COO

Location

Karlsruhe-Stadt, Karlsruhe, Deutschland

Energy, Construction

Scaling Production Capacity with Lean Assembly Line Design
Team

Order Management, Production, Industrial Engineering, Production Planning & Control, Controlling

Key Performance Indicators

Growth, Lead Time, Productivity

Impact

Output Increase: 200 → 4,000/week;
Lead Time Reduction: 25 → 12 days;
Employee Productivity: 330 → 400 units/worker;
Space Reduction: 200m² → 120m²

The Challenge

The client was having difficulties in meeting the increasing demand and was considering doubling the existing production line.

The Solution

Analyzed full production, designed an optimized lean assembly line, trained staff in lean practices, and improved space utilization.

The Result

Met rising demand with optimized production instead of duplicating inefficient lines

bottom of page